Skip to content
AsteriaStar
Planned · community aggregator

Launches

Orbital launches somebody currently intends to fly. Every one carries how precisely the date is known and when it was last confirmed, because both change constantly.

Times are UTC throughout, because an instant is the same everywhere and a local rendering would hide which day an event actually falls on for you. Nothing here knows or asks where you are. Every computed instant carries an uncertainty, and most of those are measurements rather than estimates: every build checks the lunar phases against NASA's own published table, the equinoxes, solstices and Earth's apsides against the US Naval Observatory's, and the planetary positions the remaining events are derived from against JPL Horizons. The Moon's perigee and apogee are the one family with no external table to check against, and their cards say so.

40 events

  • Soyuz 2.1b | Progress MS-35 (96P)

    Planned

    Progress MS-35 (96P). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the second. Last confirmed by the provider 9 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Launch Successful — The launch vehicle successfully inserted its payload(s) into the target orbit(s).
    Date known to the
    second, as the provider states it
    Launch provider
    Russian Federal Space Agency (ROSCOSMOS)
    Mission type
    Resupply
    Launch site
    31/6, Baikonur Cosmodrome, Republic of Kazakhstan
    Last confirmed
    Last confirmed by the provider 9 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-16T18:11:26.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from 31/6, Baikonur Cosmodrome, Republic of Kazakhstan. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Long March 12 | SatNet LEO Group 25

    Planned

    SatNet LEO Group 25. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the minute. Last confirmed by the provider 1 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Launch Successful — The launch vehicle successfully inserted its payload(s) into the target orbit(s).
    Date known to the
    minute, as the provider states it
    Launch provider
    China Aerospace Science and Technology Corporation
    Mission type
    Communications
    Launch site
    Commercial LC-2, Wenchang Space Launch Site, People's Republic of China
    Launch window
    2026-09-17T00:25:00.000Z to 2026-09-17T00:54:00.000Z
    Last confirmed
    Last confirmed by the provider 1 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-17T02:17:16.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from Commercial LC-2, Wenchang Space Launch Site, People's Republic of China. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | USSF-259

    Planned

    USSF-259. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the second. Last confirmed by the provider 2 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Launch in Flight — The launch vehicle has lifted off from the launchpad.
    Date known to the
    second, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Government/Top Secret
    Launch site
    Space Launch Complex 4E, Vandenberg SFB, CA, USA
    Launch window
    2026-09-17T01:00:00.000Z to 2026-09-17T05:00:00.000Z
    Last confirmed
    Last confirmed by the provider 2 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-17T01:24:29.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Kuaizhou 11 | Unknown Payload

    Planned

    Unknown Payload. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the hour. Last confirmed by the provider 6 days ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    hour, as the provider states it
    Launch provider
    ExPace
    Mission type
    Unknown
    Launch site
    Launch Area 95A, Jiuquan Satellite Launch Center, People's Republic of China
    Launch window
    2026-09-17T02:31:00.000Z to 2026-09-17T03:12:00.000Z
    Last confirmed
    Last confirmed by the provider 6 days ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-11T05:32:05.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Launch Area 95A, Jiuquan Satellite Launch Center, People's Republic of China. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Electron | Owl By The Dozen (StriX Launch 12)

    Planned

    Owl By The Dozen (StriX Launch 12). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the minute. Last confirmed by the provider 29 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    minute, as the provider states it
    Launch provider
    Rocket Lab
    Mission type
    Earth Science
    Launch site
    Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
    Last confirmed
    Last confirmed by the provider 29 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-15T21:43:05.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Long March 2D | Unknown Payload

    Planned

    Unknown Payload. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the hour. Last confirmed by the provider 6 days ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    hour, as the provider states it
    Launch provider
    China Aerospace Science and Technology Corporation
    Mission type
    Unknown
    Launch site
    Launch Complex 9, Taiyuan Satellite Launch Center, People's Republic of China
    Launch window
    2026-09-19T10:43:00.000Z to 2026-09-19T11:06:00.000Z
    Last confirmed
    Last confirmed by the provider 6 days ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-11T05:38:46.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Launch Complex 9, Taiyuan Satellite Launch Center, People's Republic of China. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Starlink Group 15-27

    Planned

    Starlink Group 15-27. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the minute. Last confirmed by the provider 5 days ago.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    minute, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Communications
    Launch site
    Space Launch Complex 4E, Vandenberg SFB, CA, USA
    Launch window
    2026-09-20T01:47:00.000Z to 2026-09-20T05:47:00.000Z
    Last confirmed
    Last confirmed by the provider 5 days ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-12T08:04:28.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Kinetica 1 | Unknown Payload

    Planned

    Unknown Payload. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the hour. Last confirmed by the provider 23 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    hour, as the provider states it
    Launch provider
    CAS Space
    Mission type
    Unknown
    Launch site
    Launch Area 130, Jiuquan Satellite Launch Center, People's Republic of China
    Launch window
    2026-09-20T03:54:00.000Z to 2026-09-20T04:15:00.000Z
    Last confirmed
    Last confirmed by the provider 23 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-16T03:53:37.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Launch Area 130, Jiuquan Satellite Launch Center, People's Republic of China. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Starship | Starlink Group 31-1 (Starship Flight 14)

    Planned

    Starlink Group 31-1 (Starship Flight 14). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the minute. Last confirmed by the provider 6 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    minute, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Communications
    Launch site
    Orbital Launch Pad 2, SpaceX Starbase, TX, USA
    Launch window
    2026-09-22T12:15:00.000Z to 2026-09-22T13:30:00.000Z
    Last confirmed
    Last confirmed by the provider 6 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-16T21:10:26.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from Orbital Launch Pad 2, SpaceX Starbase, TX, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | USSF-385

    Planned

    USSF-385. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the minute. Last confirmed by the provider 8 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    minute, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Government/Top Secret
    Launch site
    Space Launch Complex 4E, Vandenberg SFB, CA, USA
    Launch window
    2026-09-26T11:56:00.000Z to 2026-09-26T14:56:00.000Z
    Last confirmed
    Last confirmed by the provider 8 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-16T19:22:48.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Electron | 6x HawkEye 360

    Planned

    6x HawkEye 360. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 3. Last confirmed by the provider 41 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 3, as the provider states it
    Launch provider
    Rocket Lab
    Mission type
    Earth Science
    Launch site
    Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
    Last confirmed
    Last confirmed by the provider 41 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-06T15:20:35.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Electron | BlackSky Gen-3 6

    Planned

    BlackSky Gen-3 6. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 3. Last confirmed by the provider 41 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 3, as the provider states it
    Launch provider
    Rocket Lab
    Mission type
    Earth Science
    Launch site
    Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
    Last confirmed
    Last confirmed by the provider 41 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-06T15:07:55.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Electron | LOXSAT 1

    Planned

    LOXSAT 1. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 24 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    Rocket Lab
    Mission type
    Technology
    Launch site
    Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
    Last confirmed
    Last confirmed by the provider 24 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-24T01:41:31.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | SDA Tranche 1 Transport Layer A

    Planned

    SDA Tranche 1 Transport Layer A. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 20 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Government/Top Secret
    Launch site
    Space Launch Complex 4E, Vandenberg SFB, CA, USA
    Last confirmed
    Last confirmed by the provider 20 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-27T16:00:05.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Long March 12A | Flight 2

    Planned

    Flight 2. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 21 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    China Aerospace Science and Technology Corporation
    Mission type
    Test Flight
    Launch site
    Long March 12 series Pad, Jiuquan Satellite Launch Center, People's Republic of China
    Last confirmed
    Last confirmed by the provider 21 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-27T07:57:47.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Long March 12 series Pad, Jiuquan Satellite Launch Center, People's Republic of China. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Long March 8A | Unknown Payload

    Planned

    Unknown Payload. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 8 days ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    China Aerospace Science and Technology Corporation
    Mission type
    Unknown
    Launch site
    Commercial LC-1, Wenchang Space Launch Site, People's Republic of China
    Last confirmed
    Last confirmed by the provider 8 days ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-09T11:49:40.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Commercial LC-1, Wenchang Space Launch Site, People's Republic of China. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Soyuz 2.1b/Fregat | Kosmos (Unknown Payload)

    Planned

    Kosmos (Unknown Payload). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 3 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    Russian Space Forces
    Mission type
    Government/Top Secret
    Launch site
    Unknown Pad, Plesetsk Cosmodrome, Russian Federation
    Last confirmed
    Last confirmed by the provider 3 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-16T23:47:17.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Plesetsk Cosmodrome, Russian Federation. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Themis Demonstrator | T1H-1

    Planned

    T1H-1. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 3. Last confirmed by the provider 84 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 3, as the provider states it
    Launch provider
    European Space Agency
    Mission type
    Test Flight
    Launch site
    Launch Complex 3B, Esrange Space Center
    Last confirmed
    Last confirmed by the provider 84 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-06-25T12:03:26.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Launch Complex 3B, Esrange Space Center. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Vulcan VC6L | Amazon Leo (LV-01)

    Planned

    Amazon Leo (LV-01). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 92 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    United Launch Alliance
    Mission type
    Communications
    Launch site
    Space Launch Complex 41, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 92 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-06-16T22:59:55.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 41, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Ariane 64 Block 2 | Amazon Leo (LE-04)

    Planned

    Amazon Leo (LE-04). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the day. Last confirmed by the provider 76 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    day, as the provider states it
    Launch provider
    Arianespace
    Mission type
    Communications
    Launch site
    Ariane Launch Area 4, Guiana Space Centre, French Guiana
    Last confirmed
    Last confirmed by the provider 76 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-07-03T12:23:14.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Ariane Launch Area 4, Guiana Space Centre, French Guiana. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Nuri | NeonSat-2 to 6

    Planned

    NeonSat-2 to 6. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the minute. Last confirmed by the provider 21 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    minute, as the provider states it
    Launch provider
    Korea Aerospace Research Institute
    Mission type
    Earth Science
    Launch site
    LC-2, Naro Space Center, South Korea
    Launch window
    2026-10-07T03:23:00.000Z to 2026-10-07T04:23:00.000Z
    Last confirmed
    Last confirmed by the provider 21 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-27T02:42:27.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from LC-2, Naro Space Center, South Korea. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • H3-24 | Martian Moon eXplorer (MMX)

    Planned

    Martian Moon eXplorer (MMX). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the second. Last confirmed by the provider 27 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    Go for Launch — Current T-0 confirmed by official or reliable sources.
    Date known to the
    second, as the provider states it
    Launch provider
    Mitsubishi Heavy Industries
    Mission type
    Planetary Science
    Launch site
    Yoshinobu Launch Complex LP-2, Tanegashima Space Center, Japan
    Last confirmed
    Last confirmed by the provider 27 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-20T21:04:48.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from Yoshinobu Launch Complex LP-2, Tanegashima Space Center, Japan. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Bandwagon 5 (Dedicated Mid-Inclination Rideshare)

    Planned

    Bandwagon 5 (Dedicated Mid-Inclination Rideshare). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 27 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Dedicated Rideshare
    Launch site
    Space Launch Complex 40, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 27 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-20T21:15:21.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 40, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Crew-13

    Planned

    Crew-13. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 12 hours ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Human Exploration
    Launch site
    Space Launch Complex 40, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 12 hours ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-16T14:36:32.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 40, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Dragon CRS-2 SpX-35

    Planned

    Dragon CRS-2 SpX-35. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 12 days ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Resupply
    Launch site
    Space Launch Complex 40, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 12 days ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-04T19:26:10.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 40, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Transporter 18 (Dedicated SSO Rideshare)

    Planned

    Transporter 18 (Dedicated SSO Rideshare). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 470 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Dedicated Rideshare
    Launch site
    Space Launch Complex 4E, Vandenberg SFB, CA, USA
    Last confirmed
    Last confirmed by the provider 470 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2025-06-03T23:40:03.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon Heavy | NROL-97

    Planned

    NROL-97. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 4. Last confirmed by the provider 8 days ago.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 4, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Government/Top Secret
    Launch site
    Launch Complex 39A, Kennedy Space Center, FL, USA
    Last confirmed
    Last confirmed by the provider 8 days ago.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-09-08T16:00:29.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Launch Complex 39A, Kennedy Space Center, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Soyuz 2.1b | Progress MS-36 (97P)

    Planned

    Progress MS-36 (97P). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the minute. Last confirmed by the provider 100 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Provider status
    To Be Confirmed — Awaiting official confirmation - current date is known with some certainty.
    Date known to the
    minute, as the provider states it
    Launch provider
    Russian Federal Space Agency (ROSCOSMOS)
    Mission type
    Resupply
    Launch site
    31/6, Baikonur Cosmodrome, Republic of Kazakhstan
    Last confirmed
    Last confirmed by the provider 100 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-06-08T21:46:36.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is currently held to the minute, which usually means it is close and confirmed.

    Where it applies: Lifts off from 31/6, Baikonur Cosmodrome, Republic of Kazakhstan. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Ariane 62 | Metop-SG B1

    Planned

    Metop-SG B1. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 17 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    Arianespace
    Mission type
    Earth Science
    Launch site
    Ariane Launch Area 4, Guiana Space Centre, French Guiana
    Last confirmed
    Last confirmed by the provider 17 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-31T09:22:29.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Ariane Launch Area 4, Guiana Space Centre, French Guiana. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon Heavy | Griffin Mission One

    Planned

    Griffin Mission One. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 106 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Lunar Exploration
    Launch site
    Launch Complex 39A, Kennedy Space Center, FL, USA
    Last confirmed
    Last confirmed by the provider 106 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-06-02T15:03:17.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Launch Complex 39A, Kennedy Space Center, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • HANBIT-Nano | InnoSat-0

    Planned

    InnoSat-0. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 56 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    Innospace
    Mission type
    Technology
    Launch site
    HANBIT Pad, Alcântara Space Center, Federative Republic of Brazil
    Last confirmed
    Last confirmed by the provider 56 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-07-22T15:16:09.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from HANBIT Pad, Alcântara Space Center, Federative Republic of Brazil. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Ariane 62 | Galileo L15 (FOC FM28 & FM31)

    Planned

    Galileo L15 (FOC FM28 & FM31). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 4. Last confirmed by the provider 280 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 4, as the provider states it
    Launch provider
    Arianespace
    Mission type
    Navigation
    Launch site
    Ariane Launch Area 4, Guiana Space Centre, French Guiana
    Last confirmed
    Last confirmed by the provider 280 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2025-12-10T18:28:10.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Ariane Launch Area 4, Guiana Space Centre, French Guiana. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Electron | StriX Launch 13

    Planned

    StriX Launch 13. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 174 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    Rocket Lab
    Mission type
    Earth Science
    Launch site
    Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
    Last confirmed
    Last confirmed by the provider 174 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-03-27T00:34:00.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | CHORUS

    Planned

    CHORUS. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 4. Last confirmed by the provider 306 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 4, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Earth Science
    Launch site
    Unknown Pad, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 306 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2025-11-14T23:31:58.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Cygnus CRS-2 NG-25

    Planned

    Cygnus CRS-2 NG-25. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 41 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Resupply
    Launch site
    Space Launch Complex 40, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 41 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-07T00:02:21.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 40, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Inmarsat-7 F1 (GX-7)

    Planned

    Inmarsat-7 F1 (GX-7). A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 4. Last confirmed by the provider 225 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 4, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Communications
    Launch site
    Unknown Pad, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 225 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-02-04T11:37:33.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | SDA Tranche 1 Tracking Layer A

    Planned

    SDA Tranche 1 Tracking Layer A. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the quarter 4. Last confirmed by the provider 20 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    quarter 4, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Government/Top Secret
    Launch site
    Space Launch Complex 4E, Vandenberg SFB, CA, USA
    Last confirmed
    Last confirmed by the provider 20 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-08-27T15:58:58.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | SDA Tranche 2 Transport Layer D

    Planned

    SDA Tranche 2 Transport Layer D. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 204 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Government/Top Secret
    Launch site
    Unknown Pad, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 204 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2026-02-24T17:08:45.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | SDA Tranche 2 Transport Layer E

    Planned

    SDA Tranche 2 Transport Layer E. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 525 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Government/Top Secret
    Launch site
    Space Launch Complex 4E, Vandenberg SFB, CA, USA
    Last confirmed
    Last confirmed by the provider 525 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2025-04-10T05:42:02.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

  • Falcon 9 Block 5 | Telesat Lightspeed 1

    Planned

    Telesat Lightspeed 1. A planned launch, not a fixed one: the time shown is the provider's No Earlier Than date, known to the month. Last confirmed by the provider 315 days ago — long enough that the date may have moved without the entry being updated.

    How exact: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Provider status
    To Be Determined — Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
    Date known to the
    month, as the provider states it
    Launch provider
    SpaceX
    Mission type
    Communications
    Launch site
    Unknown Pad, Cape Canaveral SFS, FL, USA
    Last confirmed
    Last confirmed by the provider 315 days ago — long enough that the date may have moved without the entry being updated.
    Where this date comes from

    A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

    Source: Launch Library 2 (The Space Devs) — a community-maintained aggregator of operator announcements, not an agency schedule (last confirmed 2025-11-06T10:41:03.000Z)

    Uncertainty: Planned dates move, routinely by weeks. This one is not yet held to a precise time.

    Where it applies: Lifts off from Unknown Pad, Cape Canaveral SFS, FL, USA. Whether it is visible to you depends entirely on where you are relative to the site and the trajectory.

Four kinds of date

Computed
Derived on this platform from published position series. The algorithm and its version are recorded, and the stated uncertainty is the real one.
Published prediction
Taken from an authority's own published prediction. AsteriaStar reproduces it and links the document; it does not recompute it.
Annual forecast
Recurs every year at approximately the same point in Earth's orbit. The date shown is the expected one; the exact hour and the strength vary from year to year.
Planned
A date somebody intends to meet. Planned dates move, often by months. The timestamp of the last confirmation is shown so you can judge how much the date is worth.

Take this away as a calendar file: subscribe or download the next year of events, or read it as JSON from the Open Data API. Both carry the basis, the method or source, and the uncertainty for every entry.

Provenance — ll2:upcoming-launches

Forecast
Status
Forecast
Kind
Forecast
Provider
Launch Library 2
Organisation
The Space Devs
Fetched
2026-09-17 02:54 UTC
Provider cadence
30 min
Cached for
30 min
Treated as stale after
6 h
Licence
Free public access as stated by the provider; attribution given on every surface that uses it.

Source file: https://ll.thespacedevs.com/2.2.0/launch/upcoming/?limit=40&mode=list

Upcoming orbital launches from Launch Library 2, fetched from https://ll.thespacedevs.com/2.2.0/launch/upcoming/?limit=40&mode=list. The provider allows fifteen requests an hour. Thirty minutes puts AsteriaStar at two, leaving the rest of the allowance for everyone else, and a launch schedule does not change meaningfully inside half an hour — when it does change, it changes by days.

Intentions, not appointments. Every date is a No Earlier Than value whose precision the provider states explicitly, from the second down to the year, and which moves without notice. The feed is an aggregation of operator announcements maintained by volunteers, not a schedule published by any agency.